Base Energy carries out overheating assessments for new homes and non-residential buildings across England and Wales.

We demonstrate Approved Document O (Part O) compliance using the Simplified Method or dynamic thermal modelling to CIBSE TM59, produce planning-stage overheating reports for London Plan Policy SI 4, and assess non-domestic buildings to CIBSE TM52. Every assessment is fixed fee, with a typical turnaround of 5–10 working days, delivered by CIBSE-affiliated consultants from our offices in Liverpool and Staines-upon-Thames.

What is an overheating assessment?

An overheating assessment tests whether the rooms in a building will stay at comfortable temperatures during warm weather. It checks the design, glazing, shading and ventilation against a recognised standard and, where the design fails, identifies the changes needed to pass.

Well-insulated, airtight buildings retain heat, so overheating risk has increased as energy standards have tightened. Assessing it early matters because the fixes, such as smaller or differently specified windows, external shading or mechanical ventilation, affect the façade design and the build cost.

Base Energy

Do I need an overheating assessment?

You need one in either of these situations:

  • Building Regulations (Part O). Approved Document O applies to all new residential buildings in England (from 15 June 2022) and Wales (from 23 November 2022). This covers new houses and flats, care homes, student accommodation, children’s homes and similar buildings where people sleep. It does not apply to extensions or to conversions of existing buildings.
  • Planning applications. Many local planning authorities require overheating to be addressed at planning stage. In London, Policy SI 4 of the London Plan requires major developments to follow the cooling hierarchy and demonstrate overheating compliance using dynamic modelling to CIBSE TM59 (residential) or TM52 (non-residential). [Greater Manchester authorities apply equivalent requirements under Places for Everyone.]

Simplified Method or dynamic thermal modelling?

Part O offers two routes to compliance. The Simplified Method is quicker and cheaper but limits glazing and ventilation design. Dynamic thermal modelling takes longer but gives the design flexibility and is required for planning in London.

Simplified Method Dynamic thermal modelling (TM59)
How it works Checks maximum glazing areas and minimum ventilation free areas against limits set by location and whether the home is cross-ventilated Simulates hourly temperatures in every occupied room over a full year using CIBSE future weather data
Best for Houses and simpler schemes with moderate glazing, outside high-risk locations Flats, single-aspect units, large glazing, high-risk locations and planning submissions
Accepted for Building Regulations Building Regulations and planning (including London Plan SI 4)
Design flexibility Low: fixed glazing and opening limits High: tests shading, glazing specification and ventilation options
Cost and time Lower cost, faster Higher cost, longer

If a design fails the Simplified Method, dynamic modelling is usually the most cost-effective way to comply without redesigning the façade. We will tell you at quotation stage which route suits your scheme.

CIBSE TM59 compliance criteria

CIBSE TM59 is the standard method for assessing overheating in homes. For homes that are predominantly naturally ventilated, both criteria must be met:

  • Criterion A (living rooms, kitchens and bedrooms): the room must not exceed its comfort temperature by 1°C or more for more than 3% of occupied hours between May and September.
  • Criterion B (bedrooms only): the operative temperature between 10pm and 7am must not exceed 26°C for more than 1% of annual hours, equal to 32 hours.

For mechanically ventilated homes, the operative temperature must not exceed 26°C for more than 3% of annual occupied hours. For Part O, the model must also use the window-opening, noise, security and fall-protection assumptions set out in Approved Document O. This includes limiting bedroom window opening at night where external noise exceeds 40 dB LAeq,T or 55 dB LAFmax more than 10 times between 11pm and 7am.

CIBSE TM52 for non-domestic buildings

CIBSE TM52 assesses overheating in non-domestic buildings such as offices, retail and community buildings, and is the standard required by London Plan Policy SI 4 for non-residential spaces. A room fails if it does not meet two of the three TM52 criteria: hours of exceedance, daily weighted exceedance, and upper limit temperature.

How we reduce overheating risk

Where a design fails, we test mitigation in the order of the London Plan cooling hierarchy so passive measures are used before active cooling:

  • Reducing internal heat gains, including heat from communal heating pipework in corridors
  • Glazing specification (g-value), window sizes and orientation
  • External shading, balconies and brise soleil
  • Natural and purge ventilation, including openable areas and cross-ventilation
  • MVHR with summer bypass or mechanical ventilation boost
  • Low-carbon active cooling, only where passive measures cannot achieve compliance

How we reduce overheating risk

Where a design fails, we test mitigation in the order of the London Plan cooling hierarchy so passive measures are used before active cooling:

  • Reducing internal heat gains, including heat from communal heating pipework in corridors
  • Glazing specification (g-value), window sizes and orientation
  • External shading, balconies and brise soleil
  • Natural and purge ventilation, including openable areas and cross-ventilation
  • MVHR with summer bypass or mechanical ventilation boost
  • Low-carbon active cooling, only where passive measures cannot achieve compliance

Our process

  1. Quote: send drawings and we return a fixed-fee quote, usually the same day.
  2. Information: we confirm the inputs we need: plans, elevations, window schedule, ventilation strategy, and any acoustic or air quality reports.
  3. Assessment: we model the scheme and test it against Part O, TM59 or TM52.
  4. Mitigation: if any room fails, we advise on the simplest changes needed to pass and re-test.
  5. Report: we issue a compliance report ready for submission to planning or Building Control.

What you receive

  • An overheating report for planning or Building Control, with room-by-room results
  • For Part O, the completed compliance checklist and supporting evidence for Building Control
  • A clear list of the design specifications the scheme depends on, such as g-values, opening areas and ventilation rates, for the design team and contractor
  • Coordination with your SAP calculations and energy statement where we produce these too

Why choose Base Energy

Base Energy is a UK energy and sustainability consultancy with offices in Liverpool and Staines-upon-Thames covering north and south regions. We produce overheating assessments alongside the SAP  and SBEM calculations, energy statements and sustainability statements that most planning and Building Regulations submissions need, so the results are consistent across every report. We are CIBSE affiliated and Elmhurst Energy accredited, and have completed over 1000 overheating assessments for developers, architects and housing providers across England and Wales.

Do you want to discuss your Overheating Calculation requirements with one of our specialist consultants? Call us on 020 3286 2016 or 0151 933 0328 email info@baseenergy.co.uk

 