We demonstrate Approved Document O (Part O) compliance using the Simplified Method or dynamic thermal modelling to CIBSE TM59, produce planning-stage overheating reports for London Plan Policy SI 4, and assess non-domestic buildings to CIBSE TM52. Every assessment is fixed fee, with a typical turnaround of 5–10 working days, delivered by CIBSE-affiliated consultants from our offices in Liverpool and Staines-upon-Thames.
An overheating assessment tests whether the rooms in a building will stay at comfortable temperatures during warm weather. It checks the design, glazing, shading and ventilation against a recognised standard and, where the design fails, identifies the changes needed to pass.
Well-insulated, airtight buildings retain heat, so overheating risk has increased as energy standards have tightened. Assessing it early matters because the fixes, such as smaller or differently specified windows, external shading or mechanical ventilation, affect the façade design and the build cost.
You need one in either of these situations:
Part O offers two routes to compliance. The Simplified Method is quicker and cheaper but limits glazing and ventilation design. Dynamic thermal modelling takes longer but gives the design flexibility and is required for planning in London.
If a design fails the Simplified Method, dynamic modelling is usually the most cost-effective way to comply without redesigning the façade. We will tell you at quotation stage which route suits your scheme.
CIBSE TM59 is the standard method for assessing overheating in homes. For homes that are predominantly naturally ventilated, both criteria must be met:
For mechanically ventilated homes, the operative temperature must not exceed 26°C for more than 3% of annual occupied hours. For Part O, the model must also use the window-opening, noise, security and fall-protection assumptions set out in Approved Document O. This includes limiting bedroom window opening at night where external noise exceeds 40 dB LAeq,T or 55 dB LAFmax more than 10 times between 11pm and 7am.
CIBSE TM52 assesses overheating in non-domestic buildings such as offices, retail and community buildings, and is the standard required by London Plan Policy SI 4 for non-residential spaces. A room fails if it does not meet two of the three TM52 criteria: hours of exceedance, daily weighted exceedance, and upper limit temperature.
Where a design fails, we test mitigation in the order of the London Plan cooling hierarchy so passive measures are used before active cooling:
Base Energy is a UK energy and sustainability consultancy with offices in Liverpool and Staines-upon-Thames covering north and south regions. We produce overheating assessments alongside the SAP and SBEM calculations, energy statements and sustainability statements that most planning and Building Regulations submissions need, so the results are consistent across every report. We are CIBSE affiliated and Elmhurst Energy accredited, and have completed over 1000 overheating assessments for developers, architects and housing providers across England and Wales.
Do you want to discuss your Overheating Calculation requirements with one of our specialist consultants? Call us on 020 3286 2016 or 0151 933 0328 email info@baseenergy.co.uk
Call us on 020 3286 2016 or email info@baseenergy.co.uk